Establish Auto Complete PET Plastic Bottle Water Bottling Plant Production Lines process Cost:
1.This Water Lines can filling and packing 15000 bottles of water into 500ml plastic bottle.
2. It includes water treatment system, air conveyor, Lid disinfection system. bottle washing filling capping 3 in 1 machine, bottle blower, labeling system, and shrink packing machine.
3.The water treatment system includes water filter, reverse osmosis and water tank
4.The caps come to the disinfection machine from the cap elevator, in the disinfection channel, the caps will be washed Sterilized and dried, prepare for access to the capping section.
5.The bottle come into the 3 in 1 machine by the air conveyors and move to another machine by conveyors. In the 3 in 1 machine are clamped the bottles necks, and transformed by the trackwheel.
6.The labeling system consists of label sleeve machine, shrink tunnel and steam generator.
steam generator make steam for shrink tunnel. First sleeve the labels on the bottles, then run to the shrink tunnel, the steam will shrink the labels on the bottles.
7.After labeling, the bottled water come the packing machine, arranged according to the set amount, and then use pe film shrink packaging